Greatly simplify the PPC A2 scheduling itinerary
As Andy pointed out to me a long time ago, there are no structural hazards in the later pipeline stages of the A2, and so modeling them is useless. Also, modeling the top pre-dispatch stages is deceiving because, when multiple hardware threads are active, those resources are shared among the threads. The bypass definitions were mostly wrong, and so those have been removed. The resulting itinerary is much simpler, and more accurate. llvm-svn: 190562
Loading
Please register or sign in to comment