[CostModel][x86] remove cost-kind predicate for intrinsic costs
We model cost as number of instructions / uops, so it does not make sense to treat size/blended costs any differently than throughput.
Loading
Please sign in to comment
We model cost as number of instructions / uops, so it does not make sense to treat size/blended costs any differently than throughput.