Skip to content
Commit bbb4cec2 authored by Tobias Grosser's avatar Tobias Grosser
Browse files

Use schedule trees to perform post-scheduling transformations

Replacing the old band_tree based code with code that is based on the new
schedule tree [1] interface makes applying complex schedule transformations a lot
more straightforward. We now do not need to reason about the meaning of flat
schedules, but can use a more straightforward tree structure. We do not yet
exploit this a lot in the current code, but hopefully we will be able to do so
soon.

This change also allows us to drop some code, as isl now provides some higher
level interfaces to apply loop transformations such as tiling.

This change causes some small test case changes as isl uses a slightly different
way to perform loop tiling, but no significant functional changes are intended.

[1] http://impact.gforge.inria.fr/impact2014/papers/impact2014-verdoolaege.pdf

llvm-svn: 232911
parent eefb2e27
Loading
Loading
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please to comment